The work index of the ore was determined as 12.2 kWh/t. A wet ball mill 1 m × 1 m was chosen to grind the ore down to 200 microns. A 30 % pulp was made and charged to the mill, which was then rotated at 60% of the critical speed. Estimate:1. The maximum diameter of the grinding balls required at the commencement of grinding, 2.
Read On